REJANG LEBONG,
INDONESIA

PT KLAAI, INDONESIA

In Bandung Marga Village, Bermani Ulu Raya District, Rejang Lebong Regency there is a stream of river Air Klaai which is based on a study of the potential that PLTM carried out performed by PT. Klaai Dendan Energi together with hydropower consultant at Jakarta, PT. Yodya Karya (Persero), can be developed for PLTM with a capacity of up to 2 x 1300 kW (2.6 MW). PT. Klaai Dendan Lestari (KDL) as a company that involved in the construction of power plants, especially PLTM plans to develop this potential.

Electrical power generated by PLTM Klaai for sale to PT. PLN (PERSERO) based on the Power Purchase Agreement (PJBL) for 25 years between PT. Klaai Fine Energy with PT. PLN (Persero) Jambi and South Sumatra Region Bengkulu (WS2JB). The electric power generated will be distributed through the system of medium voltage network of 20 kV (on grid) PLN Ranting Curup, and will be redistributed by PLN to supply electricity needs in the Rejang Lebong Regency area.

Total​ capacity generated from this site is approximately 3.1MW. Following are more details regarding the project tenure, commencement date, expected completion date, project owner, the off-taker, EPCC contractor and financier.

CAPACITY: 2.6MW

TENURE: 25 Years

AWARDER: Perusahaan Listrik Negara (PLN)

COMMENCEMENT DATE: September 2020

EXPECTED COMPLETION DATE: TBC

PROJECT OWNER: PT Klaai Dendan Lestari (A Member of OHP Group)*

OFF-TAKER: Perusahaan Listrik Negara (PLN)

FINANCIER: TBC

PT KLAAI

PT PAT PETULAI, INDONESIA

In Desa Seguring, North Curup District, Rejang Lebong Regency, there is an Air Simpang river flow based on the study of the potential of PLTM that has been carried out by PT. Pat Petulai Energi together with a hydropower consultant in Jakarta, PT. Yodya Karya (Persero), can be developed for PLTM with a capacity of up to 2 x 1550 kW (3.1 MW). PT. Pat Petulai Energi (PPE) as a company engaged in the construction of power plants, especially PLTM plans to develop this potential.
 

The electricity generated by the Simpang PLTM will be sold to PT. PLN (PERSERO) based on the Power Purchase Agreement (PJBL) for 25 years between PT. Pat Petulai Energi with PT. PLN (Persero) Jambi and Bengkulu South Sumatra Region (WS2JB). The electricity generated will be distributed through a medium voltage network system of 20 kV (on grid) PLN Ranting Curup, and will be redistributed by PLN to supply electricity needs in the Rejang Lebong Regency area.

Total​ capacity generated from this site is approximately 2.6MW. Following are more details regarding the project tenure, commencement date, expected completion date, project owner, the off-taker, EPCC contractor and financier.

CAPACITY: 3.1MW

TENURE: 25 Years

AWARDER: Perusahaan Listrik Negara (PLN)

COMMENCEMENT DATE: September 2020

EXPECTED COMPLETION DATE: TBC

PROJECT OWNER: PT Pat Petulai Energi (A Member of OHP Group)*

OFF-TAKER: Perusahaan Listrik Negara (PLN)

FINANCIER: TBC

PT PAT PETULAI