PAHANG
PAHANG BARAT INTEGRATED

The Pahang Barat Integrated Small Hydropower Scheme Project has been proposed by Selat Serasi to be built at the district of Cameron Highlands and Lipis in the state of Pahang Darul Makmur. The project will comprise of three (3) small hydropower schemes which are located at: Sg Telom, Sg Lemoi, and Sg Jelai Kecil.
​
-
Sungai Telom (13.9MW)
-
Sungai Lemoi (12MW)
-
Sungai Jelai Kecil (18.7MW)
​


SUNGAI TELOM
​
Telom SHP consists of three schemes, which are Telom 1 Wi, Telom 1 and Telom 2 scheme. Telom 1 scheme is the combined scheme of Telom River and Wi River, while Telom 2 scheme which is located downstream of the Telom 1 scheme, are the run-off river scheme along the Telom River.
Following are more details regarding the project tenure, commencement date, expected completion date, project owner, the off-taker, EPCC contractor and financier.
​
CAPACITY: 13.9MW
TENURE: 21 Years
AWARDER: Tenaga Nasional Berhad (TNB)
COMMENCEMENT DATE: January 2021
EXPECTED COMPLETION DATE: 2024
PROJECT OWNER: Selat Serasi Sdn Bhd (A Member of OHP Group)
OFF-TAKER: Tenaga Nasional Berhad (TNB)
EPCC CONTRACTOR: KPower Berhad
FINANCIER: TBC

Sungai Telom Schemes Locations
SUNGAI LEMOI
​
Lemoi SHP consists of three schemes as well, which are Lemoi 1, Lemoi 2, and Lemoi 3 scheme. Lemoi 1 and Lemoi 2 are cascading scheme and Lemoi 3 are the run-off river scheme along the Lemoi River.
Following are more details regarding the project tenure, commencement date, expected completion date, project owner, the off-taker, EPCC contractor and financier.
​
CAPACITY: 12MW
TENURE: 21 Years
AWARDER: Tenaga Nasional Berhad (TNB)
COMMENCEMENT DATE: January 2021
EXPECTED COMPLETION DATE: 2024
PROJECT OWNER: Denai Delima Sdn Bhd (A Member of OHP Group)
OFF-TAKER: Tenaga Nasional Berhad (TNB)
EPCC CONTRACTOR: KPower Berhad
FINANCIER: TBC

Sungai Lemoi Schemes Locations
SUNGAI JELAI KECIL
​
Jelai Kecil SHP has a combined scheme and cascading schemes. Jelai Kecil 1 Incik scheme and Jelai Kecil 1 Jelai schemes are the combined scheme, while Jelai Kecil 2 and Jelai Kecil 3 are the cascading schemes along the Jelai Kecil River.
Following are more details regarding the project tenure, commencement date, expected completion date, project owner, the off-taker, EPCC contractor and financier.
​
CAPACITY: 18.7MW
TENURE: 21 Years
AWARDER: Tenaga Nasional Berhad (TNB)
COMMENCEMENT DATE: January 2021
EXPECTED COMPLETION DATE: 2024
PROJECT OWNER: Cabaran Hijau Sdn Bhd (A Member of OHP Group)
OFF-TAKER: Tenaga Nasional Berhad (TNB)
EPCC CONTRACTOR: KPower Berhad
FINANCIER: TBC

Sungai Jelai Kecil Schemes Locations




SUNGAI TELOM PROJECT DETAILS

Following is the tables for Sungai Telom schemes details for Telom 1 (Wi), Telom 1 and Telom 2.
Plant | Telom 1 (Wi) | Telom 1 | Telom 2 |
---|---|---|---|
Installed Power (MW) | 5.50 | 5.50 | 3.60 |
Annual Energy (GWh) | 29.8 | 29.8 | 19.6 |
Catchment Area (km2) | 43.7 | 43.7 | 94.4 |
Design Flow (m3/s) | 2.75 | 2.75 | 4.26 |
Gross Head (m) | 249 | 249 | 103 |
Turbine | Pelton | Pelton | Pelton |
Number of Turbine | 2 | 2 | 2 |
Power Plant Type | Run-off River | Run-off River | Run-off River |
SUNGAI LEMOI PROJECT DETAILS

Following is the tables for Sungai Lemoi schemes details for Lemoi 1, Lemoi 2 and Lemoi 3.
Plant | Lemoi 1 | Lemoi 2 | Lemoi 3 |
---|---|---|---|
Installed Power (MW) | 4.50 | 5.50 | 2.00 |
Annual Energy (GWh) | 24.4 | 29.7 | 10.8 |
Catchment Area (km2) | 45.5 | 68.6 | 21.1 |
Design Flow (m3/s) | 2.10 | 3.17 | 1.63 |
Gross Head (m) | 267 | 216 | 156 |
Turbine | Pelton | Pelton | Pelton |
Number of Turbine | 2 | 2 | 2 |
Power Plant Type | Run-off River | Cascading | Run-off River |
SUNGAI JELAI KECIL PROJECT DETAILS

Following is the tables for Sungai Jelai schemes details for Jelai Kecil 1 (Incik), Jelai Kecil 1 (Jelai), Jelai 2 and Jelai 3.
Plant | Jelai Kecil 1 (Jelai) | Jelai Kecil 2 | Jelai Kecil 3 | Jelai Kecil 1 (Incik) |
---|---|---|---|---|
Power Plant Type | Cascading | Cascading | Cascading | Cascading |
Installed Power (MW) | 3.10 | 7.60 | 3.30 | 4.70 |
Annual Energy (GWh) | 16.9 | 41 | 18.2 | 25.1 |
Catchment Area (km2) | 41 | 156 | 197 | 53 |
Design Flow (m3/s) | 1.74 | 7.10 | 8.56 | 2.60 |
Gross Head (m) | 222 | 130 | 48 | 224 |
Turbine | Pelton | Francis | Francis | Pelton |
Number of Turbine | 2 | 2 | 2 | 2 |