PAHANG BARAT INTEGRATED

The Pahang Barat Integrated Small Hydropower Scheme Project has been proposed by Selat Serasi to be built at the district of Cameron Highlands and Lipis in the state of Pahang Darul Makmur. The project will comprise of three (3) small hydropower schemes which are located at: Sg Telom, Sg Lemoi, and Sg Jelai Kecil.

  • Sungai Telom (13.9MW)

  • Sungai Lemoi (12MW)

  • Sungai Jelai Kecil (18.7MW)

SUNGAI TELOM

Telom SHP consists of three schemes, which are Telom 1 Wi, Telom 1 and Telom 2 scheme. Telom 1 scheme is the combined scheme of Telom River and Wi River, while Telom 2 scheme which is located downstream of the Telom 1 scheme, are the run-off river scheme along the Telom River. 

 

Following are more details regarding the project tenure, commencement date, expected completion date, project owner, the off-taker, EPCC contractor and financier.

CAPACITY: 13.9MW

TENURE: 21 Years

AWARDER: Tenaga Nasional Berhad (TNB)

COMMENCEMENT DATE: January 2021

EXPECTED COMPLETION DATE: 2024

PROJECT OWNER: Selat Serasi Sdn Bhd (A Member of OHP Group)

OFF-TAKER: Tenaga Nasional Berhad (TNB)

EPCC CONTRACTOR: KPower Berhad

FINANCIER: TBC

Sungai Telom Schemes Locations

SUNGAI LEMOI

Lemoi SHP consists of three schemes as well, which are Lemoi 1, Lemoi 2, and Lemoi 3 scheme. Lemoi 1 and Lemoi 2 are cascading scheme and Lemoi 3 are the run-off river scheme along the Lemoi River.

 

Following are more details regarding the project tenure, commencement date, expected completion date, project owner, the off-taker, EPCC contractor and financier.

CAPACITY: 12MW

TENURE: 21 Years

AWARDER: Tenaga Nasional Berhad (TNB)

COMMENCEMENT DATE: January 2021

EXPECTED COMPLETION DATE: 2024

PROJECT OWNER: Denai Delima Sdn Bhd (A Member of OHP Group)

OFF-TAKER: Tenaga Nasional Berhad (TNB)

EPCC CONTRACTOR: KPower Berhad

FINANCIER: TBC

Sungai Lemoi Schemes Locations

SUNGAI JELAI KECIL

Jelai Kecil SHP has a combined scheme and cascading schemes. Jelai Kecil 1 Incik scheme and Jelai Kecil 1 Jelai schemes are the combined scheme, while Jelai Kecil 2 and Jelai Kecil 3 are the cascading schemes along the Jelai Kecil River.

 

Following are more details regarding the project tenure, commencement date, expected completion date, project owner, the off-taker, EPCC contractor and financier.

CAPACITY: 18.7MW

TENURE: 21 Years

AWARDER: Tenaga Nasional Berhad (TNB)

COMMENCEMENT DATE: January 2021

EXPECTED COMPLETION DATE: 2024

PROJECT OWNER: Cabaran Hijau Sdn Bhd (A Member of OHP Group)

OFF-TAKER: Tenaga Nasional Berhad (TNB)

EPCC CONTRACTOR: KPower Berhad

FINANCIER: TBC

Sungai Jelai Kecil Schemes Locations

press to zoom

press to zoom

press to zoom

press to zoom
1/8

SUNGAI TELOM PROJECT DETAILS

Following is the tables for Sungai Telom schemes details for Telom 1 (Wi), Telom 1 and Telom 2.

Plant
Telom 1 (Wi)
Telom 1
Telom 2
Installed Power (MW)
5.50
5.50
3.60
Annual Energy (GWh)
29.8
29.8
19.6
Catchment Area (km2)
43.7
43.7
94.4
Design Flow (m3/s)
2.75
2.75
4.26
Gross Head (m)
249
249
103
Turbine
Pelton
Pelton
Pelton
Number of Turbine
2
2
2
Power Plant Type
Run-off River
Run-off River
Run-off River

SUNGAI LEMOI PROJECT DETAILS

Following is the tables for Sungai Lemoi schemes details for Lemoi 1, Lemoi 2 and Lemoi 3.

Plant
Lemoi 1
Lemoi 2
Lemoi 3
Installed Power (MW)
4.50
5.50
2.00
Annual Energy (GWh)
24.4
29.7
10.8
Catchment Area (km2)
45.5
68.6
21.1
Design Flow (m3/s)
2.10
3.17
1.63
Gross Head (m)
267
216
156
Turbine
Pelton
Pelton
Pelton
Number of Turbine
2
2
2
Power Plant Type
Run-off River
Cascading
Run-off River

SUNGAI JELAI KECIL PROJECT DETAILS

Following is the tables for Sungai Jelai schemes details for Jelai Kecil 1 (Incik), Jelai Kecil 1 (Jelai), Jelai 2 and Jelai 3.

Plant
Jelai Kecil 1 (Jelai)
Jelai Kecil 2
Jelai Kecil 3
Jelai Kecil 1 (Incik)
Power Plant Type
Cascading
Cascading
Cascading
Cascading
Installed Power (MW)
3.10
7.60
3.30
4.70
Annual Energy (GWh)
16.9
41
18.2
25.1
Catchment Area (km2)
41
156
197
53
Design Flow (m3/s)
1.74
7.10
8.56
2.60
Gross Head (m)
222
130
48
224
Turbine
Pelton
Francis
Francis
Pelton
Number of Turbine
2
2
2
2